How small orders from new suppliers slow innovation

Prototypes, trials and new ideas need parts that are in no catalogue. Why exactly these small orders get stuck in purchasing, what that costs companies in Europe and what can be done about it.

· 7 minAs of By Jann Ehrler and Mergim Pallata
In short

New things often enter a company as a small order from a supplier nobody there has set up yet. The purchasing process treats this order like a large contract. People who develop things therefore have three ways out. Buy around purchasing, take what is already orderable, or wait. Nobody has measured how often this keeps the better solution out. The individual steps are documented, the link between them is our argument.

Where new things come from

Building a prototype or testing an idea often takes something the company has never bought. A particular sensor, a sample from a small batch, a tool from a young company. The supplier for it is not set up in the system, and the order is usually worth a few hundred francs.

Research on buying around purchasing knows this case. Karjalainen and colleagues call it the forced case. It will always exist, they write, because new needs arise for which no contracts are in place yet. Whatever is new has no supplier in the system.

What one small order from a new supplier takes

Purchasing processes are built for suppliers a company orders from every year. Before the first order is possible, a new supplier needs a form, a check, bank details and a record in the system. These steps are the same whether the order that follows is worth CHF 300 or CHF 300,000.

One order costs companies in Germany EUR 121.75 of internal work on average (BME 2025). There is no independent figure for setting up a new supplier. We estimate 5 to 15 hours. That is our own estimate.

How long it takes depends on what is counted. Entering the supplier in the system takes 3 days at the median (APQC). Taking on a new supplier from start to finish mostly takes 15 to 28 days in large companies. That is how 100 procurement leaders of large corporations answered in a survey by the software vendor HICX.

At a trade fair we asked engineers how easy ordering is where they work. One of them just smiled. It is easy nowhere, came the answer.

Three ways out

When this effort stands in front of a small order, there are three ways out. Each one makes sense on its own. Each one costs the company something it does not see.

Way outWhat is documentedWhat it costs the company
Buy around purchasingAbout a quarter of invoices for indirect goods arrive without a purchase order (HTWK Leipzig 2017, German-speaking countries). The study itself warns that services without an order push the figure up. Urgency is the main reason for buying around purchasing (Bundeswehr University Munich 2024).The supplier is never checked. The head of purchasing at a chemicals company told us about a supplier that later turned out to be on a sanctions list.
Take what is already orderableAbout two thirds of electronics engineers work with a list of approved suppliers (EETech 2026, Octopart 2024). Both are surveys run by vendors, mostly in the US.The better part or the new company never gets a chance. Nobody has counted how often this happens.
WaitA review for the UK government names procurement among the processes that often delay the start of research projects (Tickell 2022). Just over half of the managers surveyed estimate that engineers spend 6 hours or more a week on procurement (Fictiv 2023, a vendor survey).The project stands still, and the hours are missing from development.

A list is not a ban. 57 % of engineers who work with such a list can have a new supplier added if they make the case (EETech 2026). And purchasing often has good reasons. 85 % of sourcing decision-makers in electronics say engineers pick parts that are hard to source (Supplyframe 2020).

The point is a different one. The easy path is the list, and every step off it takes effort. Under deadline pressure the easy path usually wins.

A study at a large car maker shows what can get lost. Ideas from start-ups were more novel than those of established suppliers and were implemented less often (Homfeldt, Rese, Simon 2019). The study does not name purchasing as the reason. It does show where new things come from.

The same wall from the other side

For young suppliers the same problem looks different. In its 2025 strategy for start-ups, the European Commission writes that the procurement processes of large companies hinder start-ups from growing.

In the UK, 52 % of scale-ups name complex procurement as a barrier to working with corporates (ScaleUp Institute 2020). A study by Nesta describes how corporates treat start-ups as if they were much larger firms, for example by asking for ISO certification.

At trade fairs we hear the same from small suppliers. They understand the problem and see how hard it is to get into large companies.

So both sides describe the same wall. For the company it is a small order with a lot of effort. For the young supplier it is a customer it cannot reach.

Why this matters in Europe

Companies in the EU spend 1.3 % of GDP on research and development, in the US it is 2.4 % (Draghi report 2024). The report speaks about regulation and finance here, not about how companies buy.

The Commission now goes further. It calls on large companies to commit voluntarily to favour European start-ups when they invest and when they buy.

Whether companies in Europe do worse here than elsewhere, we do not know. No comparison exists. What is clear is that Europe wants more new things out of its companies, and part of that comes in through small orders.

What nobody has measured

Nobody has counted how often engineers or researchers take the orderable option instead of the better one, or drop a purchase altogether. Most figures about engineers come from vendor surveys, mostly in the US. Nobody knows how large the effect is.

The individual steps are documented. New needs have no supplier, setting one up takes effort, people take a way out, and young suppliers find it hard to get in. That these steps together slow innovation is our argument. We write it down here so that it can be checked and challenged.

What companies can do

Treat small and large purchases differently. Nesta recommends this too. An order worth a few hundred francs does not need the same path as a framework contract.

Create a fast path for the first trial. Johnsen and Mikkelsen suggest that new suppliers should not have to go through the full approval for a first order.

Buy from rare suppliers through one supplier that is set up once. That is what Vemente does. Vemente buys in its own name from any supplier, including those you do not want to set up yourself. We set up and check each supplier once, in the commercial register, against sanctions lists and for export control. Your books show only Vemente.

Sources

Karjalainen, Kemppainen, van Raaij, Non-Compliant Work Behaviour in Purchasing, Journal of Business Ethics (2009)read on BME, Top-Kennzahlen im Einkauf, Durchschnittswerte 2025 (sample, German)read on APQC, Average cycle time in days to set up a supplierread on HICX, The Supplier Experience Survey (2021)read on Müller, Bollini, Indirekter Einkauf im Fokus, HTWK Leipzig and Mercateo (2017, German)read on Bundeswehr University Munich and cosinex, Maverick Buying, Einkauf am Einkauf vorbei? (2024, German)read on EETech, What Engineers Actually Do Before They Buy (2026)read on Octopart, 2024 Octopart User Survey Results (2025)read on Tickell, Independent Review of Research Bureaucracy, UK government (2022)read on Fictiv and Dimensional Research, 2023 State of Manufacturing Reportread on Dimensional Research for Supplyframe, 2020 State of Electronics Sourcingread on Homfeldt, Rese, Simon, Suppliers versus start-ups, Research Policy (2019), abstractread on European Commission, EU Startup and Scaleup Strategy (2025)read on ScaleUp Institute, Annual ScaleUp Review 2020, Access to Marketsread on Nesta and ScaleUp Institute, Scaling Together (2016)read on Draghi, The future of European competitiveness (2024)read on Johnsen, Mikkelsen, Discontinuous Innovation, Purchasing and Supplier Relationship Development, IMP conferenceread on